September 2010
Under Slab Insulation ~ September 6, 2010
10 INCHES of EPS… When the truck arrived I knew this was some serious insulation. Under slab ‘geo foam’ from ACH technologies. Over $8K. Hope it pays off.
Air Barrier.. mesh and radiant ~ September 12, 2010
Now… some detail. I put down a 6mil poly… I did two 20×100′ pieces. After having done that.. i would do a single 40×100. Plus mesh and radiant.
Slab Pour ~ September 22, 2010
Now… to pour the slab.
EARTHTUBES ~ September 24, 2010
Did I mention earthtubes… what fun. We can chat about these all day. I have two 8″ diameter sewer pipes, 100′ long each… serving as earth tubes. Preheat in the winter, pre cool and dehumidify in the summer!